Rock Creek Stream Valley Park – Wexford Drive and Beach Drive Intersection

Division: Park Development

Map of Wexford Drive intersection at Beach Drive

Click on image to enlarge


Project Description

This project studies and proposes improvements to the safety and operation of the Wexford Drive and Beach Drive intersection in Kensington. The parkway is in the Rock Creek Hiker-Biker Trail corridor within Rock Creek Stream Valley Unit#4.

Background

In response to citizen concerns about the difficulty of making a left turn from Wexford Drive onto Beach Drive during rush hour, The Maryland-National Capital Park and Planning Commission (M-NCPPC) initiated a traffic study of the intersection.  Montgomery Parks’ project team is exploring a range of options and is reviewing potential short term and long term solutions to minimize the delay for left-turning vehicles, as well as reducing the number and severity of accidents occurring at this location.  Parks staff also met with the State Highway Administration and Department of Transportation regarding various improvements at the Beach Drive & Knowles Avenue (MD547) intersection, directly to the south, which is anticipated to reduce the queuing of traffic through the Beach Drive & Wexford Drive intersection.

Please review these frequently asked questions for more details on the project.

Status/Project Update:

Montgomery Parks hosted a community meeting on February 13, 2020, to present study results and possible improvements and gather public comments.  Links to the presentation and meeting summary are below.

Project next steps include:

Montgomery Parks planned work:

Project Status
Repair street light at the intersection of Beach Drive and Wexford Drive Completed, Fall 2020
Rock Creek Trail Vision Zero Crossing and Wexford Drive restriping to divide westbound Wexford Drive into two lanes In design and scheduled for installation in FY22
Traffic Calming between Garrett Park Drive and Knowles Avenue In design and scheduled for installation in FY22
Parks worked with MDOT SHA and MCDOT on lane configuration and signage at Knowles Avenue and Beach Drive. Completed, Fall 2021
Wexford Drive and Beach Drive Intersection Reconfiguration Preferred concept plan expected in FY22. There is no construction schedule currently.

Other Agency Projects:

WSSC Beach Drive 30” Water Main Replacement: Li Ling at 301-206-8745

SHA Knowles Ave and Beach Drive Intersection Improvements: Natasha Aidoo at NAidoo@mdot.maryland.gov .

MCDOT Garrett Park Road Bridge: https://www.montgomerycountymd.gov/dot-dte/projects/garrettparkrdbridge/index.html

 

Calendar and Meeting Notes

Links to review meeting notes and presentations will be attached to each applicable calendar event as it is scheduled and completed.

 

Event Date Location
Winter 2020
Thursday, February 13, 2020,      7 p.m. Community Meeting

View the presentation
View the meeting summary
View frequently asked questions

Rock Creek Palisades Elementary School
Fall 2020 Parks working with MDOT SHA and MCDOT in the Planning Phase

* Date and time subject to change. Please confirm the schedule with Montgomery Parks Staff


M-NCPPC Staff Contact

Jennifer Bruneau, PE, LEED AP, ENV SP
M-NCPPC Park Development Division – Environmental Engineering
Jennifer.Bruneau@MontgomeryParks.org
Office: (301) 495-2568

Last Updated: November 1, 2021